September 1, 2022 to August 31, 2026
Europe/Madrid timezone

Project schedue

Objective 1 (O1) –Requirements definition, conceptual design, and essential studies

T1.1 – Remote handling requirements and integration in IFMIF-DONES target
T1.2 – NUCLEAR CALCULATIONS AND RADIATION-INDUCED ACCURACY DEGRADATION
T1.3 – Study of temperature, vibration, and Li deposition effect
T1.4 – study of Safety Requirements
T1.5 – Theoretical and modeling studies of RF, waveguide, and antennas

Objective 2 (O2) – dones-lidia demonstrator: Engineering design 

Objetive 3 (O3) – dones-lidia demonstrator: Manufacturing and assembly

Objetive 4 (O4) – dones-lidia demonstrator: Local Control System development 

Objetive 5 (O5) –dones lidia demonstrator: characterization and validation experiments